C.identify impacts of various risks D.plan suitable responses

The project life-cycle can be described as (72) .

(72)A.project concept, project planning, project execution, and project close-out B.project planning, work authorization, and project reporting

project planning, project control, project definition, WBS development, and project termination

project concept, project execution, and project reporting

(73) is a method used in Critical Path Methodology for constructing a project schedule network diagram that uses boxes or rectangles, referred to as nodes, to represent activities and connects them with arrows that show the logical relationships that exist between them.

(73)A.PERT B.AOA C.WBS D.PDM

Schedule development can require the review and revision of duration estimates and resource estimates to create an approved (74) can serve as a baseline to track progress.

(74)A.scope statement B.activity list C.project charter D.project schedule

The Develop Project Management Plan Process includes the actions necessary to define, prepare, integrate, and coordinate all

that

constituent plans into a (75) .

(75)A.Project Scope Statement B.Project Management Plan C.Forecasts D.Project Charter

2009年下半年系统集成项目管理工程师考试真题(上午).doc 将本文的Word文档下载到电脑,方便复制、编辑、收藏和打印
本文链接:https://www.diyifanwen.net/c2g5gw54wqv6msol1o4w75dq8n1si8z00uai_4.html(转载请注明文章来源)
热门推荐
Copyright © 2012-2023 第一范文网 版权所有 免责声明 | 联系我们
声明 :本网站尊重并保护知识产权,根据《信息网络传播权保护条例》,如果我们转载的作品侵犯了您的权利,请在一个月内通知我们,我们会及时删除。
客服QQ:xxxxxx 邮箱:xxxxxx@qq.com
渝ICP备2023013149号
Top