Building construction quality management

Abstract:adhere to the quality first, improve the management level, improve the quality of construction is the key, only to meet the required quality standards and user requirements under the premise of quality, time limit for a project, cost, to meet the requirements, to provide more high-quality, safe, economical and applicable building products. Based on this, the building construction quality management of.

Key words: housing construction building construction quality management

1 strengthen training, selection of construction personnel is laying the quality control personnel foundation

Engineering quality were all participants in the project construction technology management, operating personnel coordination work results, so construction workers is to form the main factor of project quality. To control the engineering quality first is the training and selection of construction personnel, improving their comprehensive quality. We should improve their quality awareness, according to comprehensive quality regardless of idea construction personnel must establish five concepts: the concept of quality first, pre-control priority idea, talk with data concept and social benefit and enterprise benefit and comprehensive benefit idea. The second is the construction of the technical quality of personnel, management, construction personnel should have higher quality planning and management capacity, production personnel should have superb technical ability, be strict in one's demands of the style of work, strict implementation of quality standards and procedures of the legal concept, service personnel should do good technology and service life, can be with excellent service indirectly to ensure engineering quality.

2 give full play to QC quality control function

According to \actively \

1

personnel together, common to the owners of construction process, responsible, quality control personnel, users, the construction personnel to establish new relations of cooperation, quality inspection staff and the construction site operations personnel is consistent, it is to provide users with high quality, satisfaction of building products. But the construction production is busy, to snatch the project schedule is loosen quality

management tendency occurs. This led to check the quality of the project is checked with contradictions between. To give full play to the initiative of the staff to check the quality of the project, it is necessary to establish the authority of the quality inspection personnel, it is very necessary and important.

3 following a case analysis gradually quality management, engineering survey:

The territory of Hechi a building for the underground layer, on the ground twenty-two, twenty-five buildings, covers an area of 2550.4 square meters, building a total height of 79.950 meters, construction area of 4008 square meters underground, on the ground 36855 square meters, balcony area is 1570.1 square meters; the main design reasonable service life is 50 years; building fire grade two, seismic fortification intensity is 7 degrees, frame aseismic grade two; the ground floor to the ground floor three layer 2-A axis 2-6 axis and 2-17 axis short limb shear wall seismic rating for a class, the rest of shear wall seismic grade two. The project uses the base form of prestressed high-strength concrete pipe pile, structure type for the cast-in-place reinforced concrete frame shear wall structure.

4 construction management

On the construction quality management, mainly involves three aspects, one is about the design, survey and document review management. On design, reconnaissance unit quality behavior and results of the activities of the supervision, the emphasis is placed on the design, survey and document review supervisory control. If the violation of the relevant laws, regulations and mandatory standards for the design and survey documents, can be through direct economic penalties and legal sanctions, enabling direct responsibility assumed by the error caused by negligence or intentional quality responsibility. Two of the activities of the bidding management, focuses on the construction bidding supervision, market supervision and quality supervision the effective integration, through the quality supervision to promote the market competition and standardization of the benign operation, effectively through market operation, to ensure the validity of quality supervision. Three is

2

the text of the contract supervision, is the focus of construction contract supervision, quality management standardization and legalization to fulfil the terms of the contract, the legal effect of contract binding the construction quality and results. By analyzing the three aspects of examination and supervision, to achieve the government's construction quality of the implementation process control and supervision. Before the construction, in the final analysis is the emphasis of quality management for owners of quality behavior

management, because the owner of all these activities of the organizers, decision makers, which is the standard construction owner quality behavior and results of the activities of the important measures.

5 construction management

5.1 Lraw materials quality control

Material quality engineering construction quality is the key, use of raw materials does not meet the requirements of engineering, engineering quality can not meet the

requirements. Therefore, in the construction quality control of stop before construction on material quality control, to ensure the quality of materials, in order to improve construction quality. For the control of materials, first of all to the common material supply necessary audit, select qualified suppliers for the supply of materials. Secondly, to approach the necessary inspection of raw materials, including: quality inspection report of the inspection, the inspection of appearance, physical and chemical inspection inspection. Through a series of tests to ensure the quality of the raw materials entering.

5.2 procedures and time limit control

To implement the handover inspection system, on the procedures of unqualified shall enter into next working procedure construction. At the same time construction quality affected by seasons, the reasonable arrangement of construction schedule is to ensure the engineering quality are important measures, and blindly rush period will inevitably lead to serious consequences. Quality control step is to establish quality control, selected key and key technology to undertake the key is checked, the two is to strengthen the operation of the management, project quality is good or bad, depends to some extent on the construction of personnel operation level.

5.3 increase on-site inspections

Quality management in the construction site should strive to grasp first-hand information, and strive to achieve the timely control, for the occurrence of the problem

3

建筑施工质量管理中英文对照外文翻译文献.doc 将本文的Word文档下载到电脑,方便复制、编辑、收藏和打印
本文链接:https://www.diyifanwen.net/c6k9zx8s5tl0wekt4q3a3_1.html(转载请注明文章来源)
热门推荐
Copyright © 2012-2023 第一范文网 版权所有 免责声明 | 联系我们
声明 :本网站尊重并保护知识产权,根据《信息网络传播权保护条例》,如果我们转载的作品侵犯了您的权利,请在一个月内通知我们,我们会及时删除。
客服QQ:xxxxxx 邮箱:xxxxxx@qq.com
渝ICP备2023013149号
Top