毕业论文
年产60万m3商品混凝土搅拌站设计
摘 要
混凝土是建筑工程中应用最广泛的材料之一,其经济、技术指标对于整个建筑工程的质量和成本有着举足轻重的关系。论文根据年产60万方的商品混凝土的规模来设计的商品混凝土搅拌站,其主要介绍了混凝土配合比设计,物料平衡计算、给排水系统、厂址选择、生产工艺流程、混凝土搅拌站设备选型计算、和经济评估等。绘制全站工艺设计流程图、全站总平面布置图和各设备连接关系的工艺布置图,手绘和cad各一份。
关键词: 商品混凝土搅拌站; 配合比设计; 设备选型;
with annual capacity of 600000 m3 of commodity
concrete mixing station design
Abstract
Concrete is one of the most widely used materials in the construction projects, the economic and technical index, which is important for the construction project quality and cost of a relationship. The commodity concrete designed according to concrete products with an annual output of 600000 side of the scale of the mixing station, it introduces the concrete mix design, material balance calculation, water supply and drainage system, site selection, production process, equipment selection and calculation of concrete mixing station, and economic evaluation. The station layout drawing process design flow chart, the general layout of the station and each equipment connection, a drawing and cad.
keywords: commercial concrete mixing plant, mixture ratio design, equipment type selection
目 录
1导论 .............................................................. 1
1.1研究背景 ..................................................... 1
1.1.1研究的目的与研究的意义 ................................. 1 1.1.2混凝土搅拌站概况 ....................................... 1 1.1.3混凝土搅拌站的国内外发展史 ............................. 1 1.1.4混凝土搅拌站的现状和发展趋势 ........................... 2 1.2混凝土搅拌站市场分析 ......................................... 5 1.3影响搅拌站发展的主要原因 ..................................... 6 1.4产品品种及生产规模 ........................................... 6 1.5编制依据 ..................................................... 6 1.6设计原则 ..................................................... 6 2 混凝土配合比设计 .................................................. 8
2.1原材料参数 ................................................... 8 2.2 配制强度 .................................................... 8 2.3水灰比 ....................................................... 8 2.4 1m3混凝土用水量 ............................................. 9 2.5 1m3混凝土水泥用量 ........................................... 9 2.6砂率 ........................................................ 10 2.7配合比 ...................................................... 11 2.8原材料用量 .................................................. 12 3 设备的选型计算 ................................................... 14
3.1 搅拌机设备选型 ............................................. 14 3.2 砂石输送设备选型计算 ....................................... 15
3.2.1水平输送带 ............................................ 16 3.2.2倾斜输送带 ............................................ 16 3.3螺旋输送机的选型 ............................................ 17 3.4 骨料配料机选型 ............................................. 17 3.5砂石仓系统 .................................................. 18
3.5.1石筒仓设计 ............................................ 18 3.5.2砂筒仓设计 ............................................ 18 3.6水泥筒仓的选用 .............................................. 19 3.7减水剂筒仓的选用 ............................................ 19 3.8 除尘器的选择 ............................................... 20 3.9计量系统 .................................................... 20 4给排水系统 ....................................................... 22
4.1给水 ........................................................ 22 4.2排水 ........................................................ 23 5混凝土搅拌站工艺流程 ............................................. 24 6建厂条件 ......................................................... 25
6.1原材料 ...................................................... 25 6.2厂址选择的具体要求和注意事项 ................................ 25
6.3供电 ........................................................ 25 6.4劳动定员及人员培训 .......................................... 26
6.4.1劳动定员 .............................................. 26 6.4.2工作制度 .............................................. 26 6.4.3人员培训 .............................................. 26
7 土建方案 ......................................................... 27
7.1建筑结构 .................................................... 27
7.1.1设计依据 .............................................. 27 7.1.2抗震设防 .............................................. 27 7.1.3地质条件 .............................................. 27 7.1.4建筑结构设计 .......................................... 27 7.2供热、通风、空调及仪器维修 .................................. 28
7.2.1供热 .................................................. 28 7.2.2通风 .................................................. 28 7.2.3空调 .................................................. 28 7.2.4机电与仪器仪表修理 .................................... 28
8电器及自动化方案 ................................................. 29
8.1设计范围 .................................................... 29 8.2供配电 ...................................................... 29 8.3电气节能 .................................................... 29 8.4生产过程自动化 .............................................. 29 8.5电器照明 .................................................... 30 8.6 防雷与接地 ................................................. 30 9 环境保护和消防 ................................................... 32
9.1环境保护 .................................................... 32
9.1.1采用的环境标准 ........................................ 32 9.1.2搅拌站的粉尘污染 ...................................... 32 9.1.3噪声控制 .............................................. 33 9.1.4废水的回收及其再利用 .................................. 33 9.1.5环境美化绿化 .......................................... 33 9.2消防 ........................................................ 33 10.项目实施进度 .................................................... 35
10.1 建设期 .................................................... 35 10.2实施进度安排 ............................................... 35 11. 总投资估算及资金来源 ........................................... 36
11.1投资估价 ................................................... 36
11.1.1编制原则 ............................................. 36 11.1.2 投资估算范围 ......................................... 36 11.1.3 投资估算依据 ......................................... 36 11.1.4 投资估算办法及说明 ................................... 36 11.2 资金筹措方案 .............................................. 38 12. 项目效益评价 ................................................... 38
12.1 计算期 .................................................... 38 12.2 投产期及达产系数 .......................................... 38