word版DL/T5210.1-2012电力建设施工质量验收及评定规程第1部分:土建工程 

来源:用户分享 时间:2025/10/23 7:35:14 本文由loading 分享 下载这篇文档手机版
说明:文章内容仅供预览,部分内容可能不全,需要完整文档或者需要复制内容,请下载word后使用。下载word有问题请添加微信号:xxxxxxx或QQ:xxxxxx 处理(尽可能给您提供完整文档),感谢您的支持与谅解。

DL / T 5210.1 — 2012

本部分是根据国家能源局“关于下达 2009 年第一批能源领域行业标准制(修)订计划的通知”(国 能科技[2009]163 号)的要求,经过广泛调查研究,认真总结实践经验,参考有关国际标准和国外先 进技术,在广泛征求意见的基础上修订而成的。

DL/T 5210《电力建设施工质量验收及评价规程》分八个部分: ——DL/T 5210.1 土建工程 ——DL/T 5210.2 锅炉机组 ——DL/T 5210.3 汽轮发电机组

——DL/T 5210.4 热工仪表及控制装置 ——DL/T 5210.5 管道及系统

——DL/T 5210.6 水处理及制氢设备和系统 ——DL/T 5210.7 焊接 ——DL/T 5210.8 加工配制 本部分是 DL/T 5210 的第 1 部分:土建工程。 共有 23 章,有关质量验收的内容设置 11 章及 3 个规范性附录和 2 个资料性附录,有关质量评价的 内容设置 10 章。本部分主要技术内容包括:1. 总则;2. 术语;3. 基本规定;4. 工程质量验收范围; 5. 通用工程质量验收;6. 热力系统土建工程质量验收;7. 燃料供应系统土建工程质量验收;8. 除灰渣 系统土建工程质量验收;9. 脱硫、脱硝土建工程质量验收;10. 供水及水处理系统土建工程质量验收; 11. 电气系统土建工程质量验收;12. 附属生产设施土建工程质量验收;13. 厂前区公共福利及与厂址有 关的土建单项工程质量验收;14. 质量评价基本规定;15. 质量评价框架体系;16. 质量评价内容;17. 基 本评价方法;18. 地基及桩基工程质量评价;19. 结构工程质量评价;20. 屋面工程质量评价;21. 装饰 装修工程质量评价;22. 建筑安装工程质量评价;23. 工程质量综合评价等。

本部分是在国家发展和改革委员会发布的 DL/T 5210.1—2005《电力建设施工质量验收及评价规程 第 1 部分:土建工程》基础上修订的。修订的主要技术内容是:

——按照“验评分离”原则,取消了原单位工程评定内容。

——为鼓励电力企业创优,规范创优活动,增加了工程质量评价部分。 ——按照《工程建设标准编写规定》,取消了范围,增加了术语、基本规定、本部分用词说明,将

规范性引用文件改为引用标准名录。

——增加了建筑节能工程、水土保持工程、室外(厂区景观)工程、脱硫脱硝工程、厂前区公共福

利及与厂址有关的单项工程等章节。

本部分中以黑体字标志的条文为强制性条文,必须严格执行。 本部分由中国电力企业联合会提出。 本部分由电力行业火电建设标准化技术委员会归口。 本部分主编单位:上海电力建筑工程公司、浙江省电力建设工程质量监督中心站。

本部分参编单位:天津电力建设公司、浙江省二建建设集团有限公司、北京国电德胜工程项目管理 有限公司、山西省电力公司电力建设四公司、河南省第二建设集团有限公司。

本部分主要起草人:楼海英、王亚耀、倪斌、叶柏金、金麟、张孝谦、高德荣、丁瑞明、俞东齐、 崔虹、孟玥玲、卢建忠、闫清江、岳明生、陈立新。

本部分主要审查人:金泽华、朱顺达、范洁、林利、袁胜、万中昌、酒大雷、郑林达、高全治、张

I

DL / T 5210.1 — 2012

盛道、李建宇、秦鲁涛、徐耀明、李强、刘鸿彦、王传煌、孟庆刚、谭彩明、巩天真。

本标准自实施之日起代替 DL/T 5210.1—2005《电力建设施工质量验收及评价规程 第 1 部分:土 建工程》。

本部分在执行过程中的意见或建议反馈至中国电力企业联合会标准化管理中心(地址:北京市白广 路二条一号,100761)。

2

DL / T 5210.1 — 2012

前言 ··································································································································································Ⅰ 1 总则 ····························································································································································· 1 2 术语 ····························································································································································· 2 3 基本规定······················································································································································ 5 4 工程质量验收范围···································································································································· 40 5 通用工程质量验收···································································································································166 5.1 一般规定···············································································································································166 5.2 施工测量···············································································································································167 5.3 土石方及基坑工程··································································································································167 5.4 桩基及地基处理工程 ······························································································································176 5.5 地下建筑防水工程··································································································································200 5.6 特殊施工法防水工程 ······························································································································205 5.7 排水工程···············································································································································207 5.8 注浆工程···············································································································································209 5.9 砌体工程···············································································································································210 5.10 混凝土结构工程 ···································································································································219 5.11 钢结构工程 ··········································································································································246 5.12 地面与楼面工程 ···································································································································279 5.13 抹灰工程 ·············································································································································305 5.14 门窗工程 ·············································································································································309 5.15 吊顶工程 ·············································································································································322 5.16 轻质隔墙工程·······································································································································324 5.17 饰面板(砖)工程································································································································328 5.18 幕墙工程 ·············································································································································332 5.19 涂饰工程 ·············································································································································340 5.20 裱糊与软包工程 ···································································································································345 5.21 装饰装修细部工程································································································································347 5.22 屋面工程 ·············································································································································350 5.23 防腐蚀工程··········································································································································360 5.24 厂区道路工程·······································································································································370 5.25 建筑给水、排水与采暖工程···················································································································380 5.26 建筑电气工程·······································································································································410 5.27 通风与空调工程 ···································································································································427 5.28 电梯工程 ·············································································································································473 5.29 智能建筑工程·······································································································································481 5.30 建筑节能工程·······································································································································484 5.31 水土保持工程·······································································································································502 5.32 室外(厂区景观)工程 ·························································································································509

3

DL / T 5210.1 — 2012

5.33 其他消防系统工程································································································································513 5.34 盾构及顶管工程 ···································································································································552

6 热力系统土建工程质量验收 ···················································································································562

6.1 一般规定···············································································································································562 6.2 钢筋混凝土结构主厂房基础 ····················································································································562 6.3 装配式钢筋混凝土结构主厂房及炉架上部结构··························································································565 6.4 现浇钢筋混凝土结构主厂房及炉架上部结构·····························································································567 6.5 钢结构主厂房上部结构···························································································································570 6.6 汽轮发电机基础工程 ······························································································································578 6.7 其他设备基础工程··································································································································585 6.8 地下设施工程 ········································································································································589 6.9 直接空冷柱工程·····································································································································595 6.10 烟囱工程 ·············································································································································595 7 燃料供应系统土建工程质量验收············································································································615 7.1 一般规定···············································································································································615 7.2 卸煤沟及地下输煤隧道···························································································································615 7.3 翻车机室、碎煤机室及转运站地下结构(含现浇钢筋混凝土煤斗结构)·····················································618 7.4 输煤栈桥钢管混凝土结构························································································································625 7.5 贮煤罐 ··················································································································································627 7.6 贮煤罐、干煤棚上部钢结构 ····················································································································630 7.7 斗轮机混凝土基础··································································································································630 7.8 燃料油罐基础 ········································································································································633 8 除灰渣系统土建工程质量验收················································································································635 8.1 一般规定···············································································································································635 8.2 贮灰场坝基与岸坡工程···························································································································635 8.3 贮灰场防渗体工程··································································································································640 8.4 贮灰场填筑工程·····································································································································643 8.5 贮灰场护坡及反滤工程···························································································································647 8.6 贮灰场堤顶及防护工程···························································································································653 8.7 冲灰沟和灰管管沟工程···························································································································660 8.8 灰管支墩、支架工程 ······························································································································660 8.9 浓缩池 ··················································································································································660 8.10 沉渣池·················································································································································663 8.11 灰库钢筋混凝土筒仓结构 ······················································································································666 8.12 跨越灰管桥··········································································································································668 9 脱硫、脱硝土建工程质量验收················································································································673 9.1 一般规定···············································································································································673 9.2 设备基础···············································································································································673 9.3 沟道工程···············································································································································673 9.4 筒仓结构···············································································································································673 10 供水及水处理系统土建工程质量验收··································································································674 10.1 一般规定 ·············································································································································674 10.2 双曲线钢筋混凝土冷却塔基础工程·········································································································674

4

DL / T 5210.1 — 2012

10.3 双曲线钢筋混凝土冷却塔斜支柱工程 ·····································································································680 10.4 双曲线钢筋混凝土冷却塔筒壁工程·········································································································684 10.5 双曲线钢筋混凝土冷却塔进水竖井工程··································································································687 10.6 双曲线钢筋混凝土冷却塔压力进水方沟工程 ···························································································687 10.7 双曲线钢筋混凝土冷却塔淋水构架工程··································································································687 10.8 双曲线钢筋混凝土冷却塔淋水装置及塔外挡风板工程··············································································692 10.9 双曲线钢筋混凝土冷却塔金属结构及其他附属设施工程···········································································700 10.10 水泵房···············································································································································702 10.11 循环水及补给水管线 ···························································································································713 10.12 循环水沟············································································································································723 10.13 水池 ··················································································································································737

11 电气系统土建工程质量验收··················································································································742

11.1 一般规定 ·············································································································································742 11.2 变电架构 ·············································································································································742 11.3 基础及设备支架 ···································································································································749 11.4 电缆沟道及直埋电缆排管 ······················································································································752 11.5 独立避雷针 ··········································································································································757 12 附属生产设施土建工程质量验收··········································································································760 13 厂前区公共福利及与厂址有关的土建单项工程质量验收···································································761 14 质量评价基本规定 ·································································································································762 15 质量评价框架体系 ·································································································································764 16 质量评价内容·········································································································································766 17 基本评价方法·········································································································································767 18 地基及桩基工程质量评价 ·····················································································································770 18.1 施工现场质量保证条件评价···················································································································770 18.2 地基及桩基工程性能检测······················································································································770 18.3 地基及桩基工程质量记录······················································································································771 18.4 地基及桩基工程尺寸偏差及限值实测 ·····································································································772 18.5 地基及桩基工程观感质量······················································································································774 19 结构工程质量评价 ·································································································································775 19.1 施工现场质量保证条件评价···················································································································775 19.2 结构工程性能检测································································································································775 19.3 结构工程质量记录································································································································778 19.4 结构工程尺寸偏差及限值实测 ···············································································································781 19.5 结构工程观感质量································································································································784 20 屋面工程质量评价 ·································································································································787 20.1 施工现场质量保证条件评价···················································································································787 20.2 屋面工程性能检测································································································································787 20.3 屋面工程质量记录································································································································787 20.4 屋面工程尺寸偏差及限值实测 ···············································································································789 20.5 屋面工程观感质量································································································································790 21 装饰装修工程质量评价 ·························································································································791 21.1 施工现场质量保证条件评价···················································································································791

5

word版DL/T5210.1-2012电力建设施工质量验收及评定规程第1部分:土建工程 .doc 将本文的Word文档下载到电脑,方便复制、编辑、收藏和打印
本文链接:https://www.diyifanwen.net/c0rktb31ojd0weks4q8jb3z01x0bw3600n6h_1.html(转载请注明文章来源)
热门推荐
Copyright © 2012-2023 第一范文网 版权所有 免责声明 | 联系我们
声明 :本网站尊重并保护知识产权,根据《信息网络传播权保护条例》,如果我们转载的作品侵犯了您的权利,请在一个月内通知我们,我们会及时删除。
客服QQ:xxxxxx 邮箱:xxxxxx@qq.com
渝ICP备2023013149号
Top