construction engineering design documents? It is the main basis for prq)aring the project investment budget and the main reference for the preparation of bidding documents? Therefore, careful construction of the construction organization will have a very important role in determining the project cost and reducing the investment in the project, which will help control the construction cost.

2.2 The construction organization plan is an important means for scientific management of construction activities. It has the dual role of strategic deployment and tactical arrangements? It embodies the requirements for realizing the basic construction plan and design, provides the contents of the construction preparation work in each phase, and coordinates the mutual relations between each construction work area, each construction work type, and each voluntary work in the construction process. The construction organization plan must be able to determine the basic combination of various factors of production based on the characteristics and requirements of the engineering product and the current and possible winning construction conditions. It is impossible to carry out any production without effectively solving

the problem??

3. Index calculation and analysis of construction organization design

At present, what indicators should be established in the construction organization design are not uniform and the calculation method is not standardized? As it is a yardstick for evaluating the overall effect of construction organization design and evaluation of implementation status, it is also the basis for examining the level and effect of production, operation and management of the unit (project department) that undertakes construction. We should pay attention to the following suggestions

?

3. 1 indicator system. The index system should be set up to reflect the level reached by the construction organization's design goals and provide convenience for evaluation, assessment, and implementation.

3. 2 Index calculations?(1) Construction preparation period. From the start of site preparation to the full time of formal project start-up. (2) Unit project duration. The construction period arranged by the unit construction schedule?(3) Labor

施工组织设计外文文献翻译中英文.docx.doc 将本文的Word文档下载到电脑,方便复制、编辑、收藏和打印
本文链接:https://www.diyifanwen.net/c3tu5444m9z5dq8n1sig30fluh9boav00ugl_2.html(转载请注明文章来源)
热门推荐
Copyright © 2012-2023 第一范文网 版权所有 免责声明 | 联系我们
声明 :本网站尊重并保护知识产权,根据《信息网络传播权保护条例》,如果我们转载的作品侵犯了您的权利,请在一个月内通知我们,我们会及时删除。
客服QQ:xxxxxx 邮箱:xxxxxx@qq.com
渝ICP备2023013149号
Top