Procedure for Cleaning,Flushing,Gauging and Hydro Testing of Pipelines

来源:用户分享 时间:2025/5/15 8:53:34 本文由loading 分享 下载这篇文档手机版
说明:文章内容仅供预览,部分内容可能不全,需要完整文档或者需要复制内容,请下载word后使用。下载word有问题请添加微信号:xxxxxxx或QQ:xxxxxx 处理(尽可能给您提供完整文档),感谢您的支持与谅解。

East-west Gas Pipeline Project Construction Procedure for Cleaning, Gauging And Hydro testing of Pipelines Rev.: A1 China Petroleum Pipeline Bureau(CPP) Document No.: EWPL00-COS-PR-0014 Annexure:Pipeline Filling – Log of operations Section: Joint no from __________________ To ______________________ OD (mm) Source: Inhibitors (Yes/ No): Dosage (ppm) Fill pump Location: Model: Max pressure (bar) Dosing pump Make: Output (M3/ min): Flow meter Make: Sr. no. Pig sequence Pre-fill length (mtrs) 1st pig type Volume (m3) 2nd pig type Model Calibration valid upto Model: Max. pressure (bar): Make: Output (M3/ min): Wall Thk ( mm) Min: Max: ID (mm) Min: Max: Material: API 5L Gr X70 Length (Kms) Volume (M3) Testing medium: (Water) Location : Type of inhibitors: Filling direction From Km __________________________ To km __________________________ Length between 1st & 2nd pig 1

Fill pressure (bar) Flow Vol (m3) between 1st & 2nd pig Time meter Volume (m) 33Cum. Vol. of water pumped after 2 pig ndreading (m) this period Fill water temp. Remarks (m) 3 Page 45 of 56

East-west Gas Pipeline Project Construction Procedure for Cleaning, Gauging And Hydro testing of Pipelines Rev.: A1 China Petroleum Pipeline Bureau(CPP) Document No.: EWPL00-COS-PR-0014 Note:

1. Reading to be recorded half hourly;

Remarks: ________________________________________________________________________________ ________________________________________________________________________________________ Acceptance of section filling: Yes/ No Signature Name Date Contractor REAL

Page 46 of 56

East-west Gas Pipeline Project Construction Procedure for Cleaning, Gauging And Hydro testing of Pipelines Rev.: A1 China Petroleum Pipeline Bureau(CPP) Document No.: EWPL00-COS-PR-0014 Annexure:Air Volume Calculations Section: Joint no from __________________ To ______________________ OD (mm) Wall Thk ( mm) Min: Max: Min: ID (mm) Max: Material: API 5L Gr X70 Length (Kms) Volume (M) 3

Air volume test carried out at ______ % of test pressure Test station location Test pressure (bar) 2 Make DEAD WEIGHT TESTER Dead weight tester (bar) Model Avg pipe temp (deg C) ?p Pressure lowering (bar) Vi Volume of water (ltrs) Calibration valid upto: Date & time Initial After first lowering After 2 lowering nd

Air volume calculations

Formula:

Vp = ((0.884 x ri / t)+ A) x 10 x Vt x ?p x k Where

Vi = Volume of drained water (m3)

Vp = Computed water volume to lower the pressure in the section by ?P (m3) ri = Nominal inside radius of pipe (mm) t = nominal pipe wall thickness (mm)

A = Water compressibility factor at given pressure and temp x 10 Vt = Geometric volume of section (m3)

K = A dimensionless co-efficient equel to 1.02 for longitudinally welded pipe ?p = Lowering of pressure (bar)

Page 47 of 56

-6

-6

East-west Gas Pipeline Project Construction Procedure for Cleaning, Gauging And Hydro testing of Pipelines Rev.: A1 China Petroleum Pipeline Bureau(CPP) Document No.: EWPL00-COS-PR-0014 Vi/ Vp = 1 to 1.06

Remarks:

_____________________________________________________________________________________ _____________________________________________________________________________________ _____________________________________________________________________________________

3

ACCEPTED / NOT ACCPTED

Signature Name Date

Page 48 of 56

Contractor REAL Other

搜索更多关于: Procedure for Cleaning,Flushin 的文档
Procedure for Cleaning,Flushing,Gauging and Hydro Testing of Pipelines.doc 将本文的Word文档下载到电脑,方便复制、编辑、收藏和打印
本文链接:https://www.diyifanwen.net/c3wqp26i2z168ub00wplo_12.html(转载请注明文章来源)
热门推荐
Copyright © 2012-2023 第一范文网 版权所有 免责声明 | 联系我们
声明 :本网站尊重并保护知识产权,根据《信息网络传播权保护条例》,如果我们转载的作品侵犯了您的权利,请在一个月内通知我们,我们会及时删除。
客服QQ:xxxxxx 邮箱:xxxxxx@qq.com
渝ICP备2023013149号
Top