SAP-IDES101.物料主数据更改管理

IDES - The SAP Model Company Translated by baiboyd.itpub.net

Material Master Change Mgmt and Planning Material

Master Changes

物料主数据更改管理和计划更改

Purpose 目的

You can change the material master using one of three different methods. The easiest method is to change the required fields in the material master and activate these changes immediately. Changes can also be planned in advance. You do this either by entering a planned change for a single material master (with the date on which the changes are activated) or using the Engineering Change Management function. In this case, changes to several objects (materials, BOMs, task lists, and so on) can be grouped together in a change master record and activated on a defined date.

你可以使用三种不同的方法来更改物料主数据。最简便的方法是只需更改需要的栏位并立即激活它们。更改活动也可以预期计划。你可以输入一个更改计划用于单个物料主记录(包括更改生效的日期),或也可以使用工程更改管理功能。在这种情况下,@? 几个对象(物料、物料清单、计划清单等等)的更改汇集到一个变更主记录中,并在同一个事先定义的日期内生效。

You can find the data for this process under 使用以下方法你可以查找得到相关的数据:

.

Data Used During This Process 这个过程用到的数据

Field 栏位 Plant 工厂 Material 物料 Change master Europe 欧洲 1000 1300-520 MMCM-PUR North America 北美洲 3000 1300-520 MMCM-PUR Description 描述 Plant number 工厂代码 Material number 物料编号 Change master record number 主数据更改编号 record 更改主记录 Process Flow 操作步骤

1. Changing the Material Master Immediately

立即更改物料主数据

2. Planning Changes to the Material Master

计划更改物料主数据

Pages 2 / 13

IDES - The SAP Model Company Translated by baiboyd.itpub.net

3. Displaying the Change Master Record

显示更改主记录

4. Displaying Planned Changes

显示计划更改

5. Activating Planned Changes

激活计划更改

Changing the Material Master 更改物料主数据

Procedure 步骤

1. Call up the transaction as follows:

调用事务时请使用:

Menu Path 菜单路径 Logistics ? Materials Management ? Material Master ? Material ? Change ? Immediately 后勤?物料管理?物料主数据?物料?更改?立即 Transaction Code 事务代码 MM02

2. On the Change Material: Initial Screen, enter the following data:

在更改物料:初始屏幕,输入如下条目:

Field 栏位 Europe 欧洲 North America 北美洲 Pages 3 / 13

IDES - The SAP Model Company Translated by baiboyd.itpub.net

Material 物料 1300-520 1300-520

3. Choose Select view(s). 选定[选择视图]

The Select Views dialog box appears. 弹出[选择视图]对话框

4. Choose Purchasing. 选定[采购] 5. Choose

. 选定

(或回车)

6. In the Organizational Levels dialog box, enter the following data:

有[组织级别]对话框中,输入如下条目:

Pages 4 / 13

搜索更多关于: SAP-IDES101.物料主数据更改管理 的文档
SAP-IDES101.物料主数据更改管理.doc 将本文的Word文档下载到电脑,方便复制、编辑、收藏和打印
本文链接:https://www.diyifanwen.net/c3ykzs81y3d4yj364q360565jb3urvy010y7_1.html(转载请注明文章来源)
热门推荐
Copyright © 2012-2023 第一范文网 版权所有 免责声明 | 联系我们
声明 :本网站尊重并保护知识产权,根据《信息网络传播权保护条例》,如果我们转载的作品侵犯了您的权利,请在一个月内通知我们,我们会及时删除。
客服QQ:xxxxxx 邮箱:xxxxxx@qq.com
渝ICP备2023013149号
Top