第一范文网 - 专业文章范例文档资料分享平台

国开(电大)本科《管理英语4》形考任务(单元自测1至8)试题及答案

来源:用户分享 时间:2025/6/1 13:52:58 本文由loading 分享 下载这篇文档手机版
说明:文章内容仅供预览,部分内容可能不全,需要完整文档或者需要复制内容,请下载word后使用。下载word有问题请添加微信号:xxxxxxx或QQ:xxxxxx 处理(尽可能给您提供完整文档),感谢您的支持与谅解。

4. How long did Mike's friend have his driving license suspended? {A; B; C}

A. Two months. B. Three months. C. Four months. 5. Crackdown means __________. {A; B; C}

A. downfall B. breaking down C. restricting undesirable actions

参考答案:子问题 1:C; 子问题 2:B; 子问题 3:A; 子问题 4:B; 子问题 5:C

题目14:I bought a new car last month, but I ______ my old car yet.

A. did not sell ; B.have not sold ; C. had not sold 参考答案:have not sold

题目15:I didn't finish my homework. Neither ______. A.did he ; B.didn't he ; C.he did 参考答案:did he

题目16:— When do we have to pay the bill? —____ December 30.

A.By ; B. In ;C.During 参考答案:By

题目17:二、阅读理解 阅读下面的文章,根据文章内容,完成相应的选择题。(每题10分)

ROAD CLOSURE PROCEDURES IN SYDNEY

To minimize traffic jams in the city center and on major roads out of Sydney, the City's highway department will not agree to road closures scheduled for weekdays or Saturdays. On minor roads

outside the city center, weekdays and Saturdays may be considered. You must apply for approval to do roadwork and other road-related activities, tree cutting and use of very large construction machinery, ladders, etc. Please note that approval is needed if you plan to block the road or footpath.

Applications to have a road closed to traffic must be completed and sent to the Department's Traffic Calming Committee at least a month before the scheduled date.

Roads can be closed partially or fully, depending on your requirements. Partial road closures are only allowed in light traffic areas where there will be at least 1 lane for traffic with extra traffic control measures to make sure 2-way traffic can continue to run for the duration of the work. Any change of traffic flow will require the proposal to be treated as a full road closure. For further information about a partial road closure, please refer to Contacts.

If you are organizing a parade, march or other type of

street-based event, approval is also required and we recommend you choose one of our 4 preferred routes. Choosing an existing route reduces the amount of planning you will need to do.

操作提示:通过题干后的下拉框选择题目的正确答案。

1. As a rule, Sydney's highway department will agree to road closures in the city centre scheduled for __________. {A; B; C} A. weekdays B. Saturdays C. Sundays

2. If you want a road closed to traffic, you must complete your applications and send them to the relevant

committee at least__________ before the scheduled date. {A; B; C}

A. a week B. 30 days C. two months

3. Partial of full road closures are decided by _________. {A; B; C}

A. the requirements from applicants B. the traffic flow C. the road conditions

4. Which is NOT the condition for partial road closures according to the passage? {A; B; C}

A. In light traffic areas. B. On work days. C. There will be at least 1 lane for traffic during the work.

5. Which is the best title of this passage? {A; B; C} A. Road Closure Procedures in Sydney B. Road Conditions in Sydney C. Road Management in Sydney

参考答案:子问题 1:C; 子问题 2:B; 子问题 3:A; 子问题 4:B; 子问题 5:A

题目18:We ____ the last bus and didn't have any money for taxi, so we had to walk home.

A. lost ; B.missed ; C.caught 参考答案:missed

题目19:二、阅读理解 阅读下面的文章,根据文章内容判断文章后的句子是正确(T)还是错误(F)。(每题10分)

ROAD CLOSURE PROCEDURES IN SYDNEY

To minimize traffic jams in the city center and on major roads out of Sydney, the City's highway department will not agree to road closures scheduled for weekdays or Saturdays. On minor roads

outside the city center, weekdays and Saturdays may be considered. You must apply for approval to do roadwork and other road-related activities, tree cutting and use of very large construction machinery, ladders, etc. Please note that approval is needed if you plan to block the road or footpath.

Applications to have a road closed to traffic must be completed and sent to the Department's Traffic Calming Committee at least a month before the scheduled date. Roads can be closed partially or fully, depending on your requirements. Partial road closures are only allowed in light traffic areas where there will be at least 1 lane for traffic with extra traffic control measures to make sure 2-way traffic can continue to run for the duration of the work. Any change of traffic flow will require the proposal to be treated as a full road closure. For further information about a partial road closure, please refer to Contacts.

If you are organizing a parade, march or other type of

street-based event, approval is also required and we recommend you choose one of our 4 preferred routes. Choosing an existing route reduces the amount of planning you will need to do.

操作提示:句子正确选择下拉选项框为“T”;句子错误选择下拉选项框为“F”。

1. Closures scheduled for Sundays on minor roads outside the city center may be considered. {T; F}

2. You need to get approval if you plan to block the road or footpath. {T; F}

3. Roads can only be closed partially. {T; F}

4. If you choose an existing route for a parade, the amount of planning will be reduced. {T; F}

5. Road closure applications can be sent to the Department's Traffic Calming Committee one week before the scheduled date. {T; F}

参考答案:子问题 1:F; 子问题 2:T; 子问题 3:F; 子问题 4:T; 子问题 5:F

国开(电大)本科《管理英语4》形考任务(单元自测1至8)试题及答案.doc 将本文的Word文档下载到电脑,方便复制、编辑、收藏和打印
本文链接:https://www.diyifanwen.net/c4gus95jx7r62h6002tw881m9s40m5v00jtp_10.html(转载请注明文章来源)
热门推荐
Copyright © 2012-2023 第一范文网 版权所有 免责声明 | 联系我们
声明 :本网站尊重并保护知识产权,根据《信息网络传播权保护条例》,如果我们转载的作品侵犯了您的权利,请在一个月内通知我们,我们会及时删除。
客服QQ:xxxxxx 邮箱:xxxxxx@qq.com
渝ICP备2023013149号
Top