curtain wall installation process due to its large amount of
inconvenience of construction, high precision and play a very important role. If mullion is installed, the entire schedule
JL-A002
临电施工 报审表
工程名称:都江堰市聚源镇小学道路工程 编号: 致 (监理单位):
现报上都江堰市聚源镇小学道路工程临电施工,已经我单位上级技术负责人审查批准,请予审查和批准。
附:临电施工施工方案
承包单位项目部(公章): 项目负责人(签字): 项目技术负责人(签字): 日 期: 专业监理工程师审查意见:
1.同意 2.不同意 3.按以下主要内容修改补充 专业监理工程师(签字): 日期: 总监理工程师审查意见:
1.同意 2.不同意 3.按以下主要内容修改补充后 并于 月 日前报来。 项目监理机构(公章): 总监理工程师(签字): 日 期:
注:本表由施工单位填写,一式三份,连同施工组织设计一并送项目监理机构审查。建设、监理、施工单位各一份。
people. 6. measures to avoid loss of life or damage to property. 2.19 the mullion installation 1. Note: vertical installation in all
curtain wall installation process due to its large amount of
inconvenience of construction, high precision and play a very important role. If mullion is installed, the entire schedule
people. 6. measures to avoid loss of life or damage to property. 2.19 the mullion installation 1. Note: vertical installation in all curtain wall installation process due to its large amount of
inconvenience of construction, high precision and play a very important role. If mullion is installed, the entire schedule