Q2k = (Fk + Gk) / n + Mxk * Yi / ∑Yi ^ 2 = 285.2+(10916*4/2)/(6*4^2/4) = 1194.9kN ≤ 1.2Ra = 1320kN
Q3k = (Fk + Gk) / n + Mxk * Yi / ∑Yi ^ 2 + Myk * Xi / ∑Xi ^ 2 = 285.2+(10916*4/2)/(6*4^2/4)+(980*2)/(4*2^2) = 1317.4kN ≤ 1.2Ra = 1320kN
Q4k = (Fk + Gk) / n - Mxk * Yi / ∑Yi ^ 2 - Myk * Xi / ∑Xi ^ 2 = 285.2-(10916*4/2)/(6*4^2/4)-(980*2)/(4*2^2) = -747.0kN ≤ 1.2Ra = 1320kN Q5k = (Fk + Gk) / n - Mxk * Yi / ∑Yi ^ 2 = 285.2-(10916*4/2)/(6*4^2/4) = -624.5kN ≤ 1.2Ra = 1320kN
Q6k = (Fk + Gk) / n - Mxk * Yi / ∑Yi ^ 2 + Myk * Xi / ∑Xi ^ 2 = 285.2-(10916*4/2)/(6*4^2/4)+(980*2)/(4*2^2) = -502.0kN ≤ 1.2Ra = 1320kN
每根单桩所分配的承台自重和承台上土自重标准值 Qgk: Qgk = Gk / n = 811.2/6 = 135.2kN
扣除承台和其上填土自重后的各桩桩顶相应于荷载效应基本组合时的竖向力设计值:
Ni = γz * (Qik - Qgk)
N1 = 1.35*(1072.4-135.2) = 1265.2kN N2 = 1.35*(1194.9-135.2) = 1430.6kN N3 = 1.35*(1317.4-135.2) = 1595.9kN
N4 = 1.35*(-747-135.2) = -1190.9kN N5 = 1.35*(-624.5-135.2) = -1025.6kN N6 = 1.35*(-502-135.2) = -860.2kN (2)、X 轴方向柱边的弯矩设计值:(绕 X 轴)
柱上边缘 MxctU = (N4 + N5 + N6) * (Sb - bc) / 2 =
(-1190.9+-1025.6+-860.2)*(4-2.8)/2 = -1846.0kN·m 柱下边缘 MxctD = (N1 + N2 + N3) * (Sb - bc) / 2
= (1265.2+1430.6+1595.9)*(4-2.8)/2 = 2575.0kN·m
Mxct = Max{MxctU, MxctD} = 2575.0kN·m ②号筋 Asy = 8147mm
ζ = 0.031 ρ = 0.15%
47Φ16@110 (As
ρmin = 0.15% As,min = 9360mm= 9450)
(3)、Y 轴方向柱边的弯矩设计值:(绕 Y 轴)
柱左边缘 MyctL = (N1 + N4) * (Sa - 0.5hc)
= (1265.2+-1190.9)*(2-2.8/2) = 44.6kN·m
柱右边缘 MyctR = (N3 + N6) * (Sa - 0.5hc)
= (1595.9+-860.2)*(2-2.8/2) = 441.5kN·m
Myct = Max{MyctL, MyctR} = 441.5kN·m ①号筋 Asx = 1353mm
ζ = 0.005 ρ = 0.02%
47Φ16@110 (As
ρmin = 0.15% As,min = 9360mm= 9450)
2、承台受冲切承载力计算: (1)、柱对承台的冲切计算:
扣除承台及其上填土自重,作用在冲切破坏锥体上的冲切力设计值: Fl = 1215000N
柱对承台的冲切,可按下列公式计算:
Fl ≤ 2 * [βox * (bc + aoy) + βoy * (hc + aox)] * βhp * ft * ho (基础规范 8.5.17-1) X 方向上自柱边到最近桩边的水平距离:
aox = 2000 - 0.5hc - 0.5d = 2000-2800/2-400/2 = 400mm λox = aox / ho = 400/(1200-110) = 0.367
X 方向上冲切系数 βox = 0.84 / (λox + 0.2) (基础规范 8.5.17-3) βox = 0.84/(0.367+0.2) = 1.482 Y 方向上自柱边到最近桩边的水平距离:
aoy = 2000 - 0.5bc - 0.5d = 2000-2800/2-400/2 = 400mm λoy = aoy / ho = 400/(1200-110) = 0.367
Y 方向上冲切系数 βoy = 0.84 / (λoy + 0.2) (基础规范 8.5.17-4) βoy = 0.84/(0.367+0.2) = 1.482
2 * [βox * (bc + aoy) + βoy * (hc + aox)] * βhp * ft * ho = 2*[1.482*(2800+400)+1.482*(2800+400)]*0.967*1.433*1090 = 28631467N ≥ Fl = 1215000N,满足要求。
(2)、角桩对承台的冲切计算:
扣除承台和其上填土自重后的角桩桩顶相应于荷载效应基本组合时的竖向力设计值:
Nl = Nmax = 1595925N
承台受角桩冲切的承载力按下列公式计算:
Nl ≤ [β1x * (c2 + a1y / 2) + β1y * (c1 + a1x / 2)] * βhp * ft * ho (基础规范 8.5.17-5)
X 方向上自桩内边缘到最近柱边的水平距离:
a1x = 2000 - 0.5hc - 0.5d = 2000-2800/2-400/2 = 400mm λ1x = a1x / ho = 400/(1200-110) = 0.367
X 方向上角桩冲切系数 β1x = 0.56 / (λ1x + 0.2) (基础规范 8.5.17-6)
β1x = 0.56/(0.367+0.2) = 0.988
Y 方向上自桩内边缘到最近柱边的水平距离:
a1y = 2000 - 0.5bc - 0.5d = 2000-2800/2-400/2 = 400mm λ1y = a1y / ho = 400/(1200-110) = 0.367
Y 方向上角桩冲切系数 β1y = 0.56 / (λ1y + 0.2) (基础规范 8.5.17-7)
β1y = 0.56/(0.367+0.2) = 0.988
桩内边缘到承台外边缘的水平距离:
c1 = c2 = Sc + 0.5d = 600+400/2 = 800mm
相关推荐: