µÚÒ»·¶ÎÄÍø - רҵÎÄÕ·¶ÀýÎĵµ×ÊÁÏ·ÖÏíÆ½Ì¨

º£ÑóʯÓÍ×ê¾®³£ÓÃÓ¢ÓïÊÖ²á

À´Ô´£ºÓû§·ÖÏí ʱ¼ä£º2025/5/30 14:19:51 ±¾ÎÄÓÉloading ·ÖÏí ÏÂÔØÕâÆªÎĵµÊÖ»ú°æ
˵Ã÷£ºÎÄÕÂÄÚÈݽö¹©Ô¤ÀÀ£¬²¿·ÖÄÚÈÝ¿ÉÄܲ»È«£¬ÐèÒªÍêÕûÎĵµ»òÕßÐèÒª¸´ÖÆÄÚÈÝ£¬ÇëÏÂÔØwordºóʹÓá£ÏÂÔØwordÓÐÎÊÌâÇëÌí¼Ó΢ÐźÅ:xxxxxxx»òQQ£ºxxxxxx ´¦Àí£¨¾¡¿ÉÄܸøÄúÌṩÍêÕûÎĵµ£©£¬¸ÐлÄúµÄÖ§³ÖÓëÁ½⡣

º£ÑóʯÓÍ×ê¾®³£ÓÃÓ¢ÓïÊÖ²á.txt³Ô°É³Ô°É²»ÊÇ×ÔÙÅÖµÄÈËÒ²ÓÐȨÀûÈ¥Ôö·Ê£¡ÃçÌõ±³ºóÆäʵÊÇã¾ã²£¬°®ÄãµÄÈ˲»»áÔÚºõÄãµÄÑüΧ£¡³¢³¢À«±ðÒѾÃÃÀʳµÄ×Ì棬¾ÍËã³ÅËÀÒ²ÊÇÒ»ÖÖÃÀ£¡¼õ·Ê×î¿ÉŵIJ»ÊǼ¢¶ö£¬¶øÊÇÄãÃ÷Ã÷²»¶öµ«×ܾõµÃ·ÇµÃ³Ôµãʲô²Å̤ʵ¡£A Handbook of English for Offshore Oil Drilling º£ÑóʯÓÍ×ê¾®³£ÓÃÓ¢ÓïÊÖ²á

Drilling ×ê¾®

Carry out drilling operation in accordance with the drilling program. °´×ê¾®³ÌÐò½øÐÐ×ê¾®×÷Òµ.

Prepared bell nipple. ×¼±¸¡±À®°È¿Ú¡±¶Ì½Ú. Make up 2 joints of drill pipe. ½ÓÁ½¸ù×ê¸Ë. Break out this connection. ж¿ª¸Ã½ÓÍ·. Run hole opener to sea bed. ÏÂÀ©ÑÛÆ÷µ½º£µ×

Mix gel fluid for drilling conductor hole. Ϊ×êµ¼¹Ü¾®ÑÛÅäÖÆ¸ßÕ³¶ÈÄཬ. Make up bottom hole assembly. ×éºÏϲ¿×ê¾ß

Check and reset crown-saver on every tour. ÿ¸ö°à¶¼Òª¼ì²é²¢ÖØÐµ÷ÕûÌì³µ·ÀÅö×°ÖÃ. Number stands on trip out and trip in. ÆðÏÂ×êʱ¸øÁ¢Öù±àºÅ. Pick up BHA and run to seafloor. ½«Ï²¿×ê¾ßϵ½º£µ×. Pick up stands. ½ÓÁ¢Öù

Don¡¯t drill faster than 15 minutes for 1 stand. ×ê½øËٶȱ𳬹ý15·ÖÖÓ1¸ùÁ¢Öù Drop TOTCO. Ͷ(ÌÕÌØ)²âбÒÇ

Fish TOTCO with overshot. ÓôòÀÌͲÀÌÆð²âбÒÇ Resume drilling to T.D. ¼ÌÐø×ê½øµ½×ÜÉî Circulate 15 minutes.Ñ­»·15·ÖÖÓ Run in hole. ÏÂ×ê Put out of hole. Æð×ê

Make an inventory of all ring gaskets. ¿ªÒ»¸öËùÓеæÈ¦µÄÇåµ¥ Use spinning tong. ʹÓÃÆø¶¯°âÊÖ Operate the air winch. ²Ù×÷Æø¶¯½Ê³µ

Lay down 57 joints of 5¡± drill pipe. ˦57¸ù×ê¸Ë Pick up drill stem test tool. ÌáÆð×ê¸Ë²âÊÔ¹¤¾ß Circulate mud for 2 hours. Ñ­»·Äཬ2Сʱ

Move string during circulation. ÔÚÑ­»·Ê±×¢Òâ»î¶¯×ê¾ß Circulate hole clean. Ñ­»·ÇåÏ´¾®ÑÛ Circulate bottoms up. Ñ­»·Äཬ¼¸ÖÜ

Fill up every 5 stands. ÿ5Öù¹àÄཬһ´Î

Check mud weight every 15 minutes. ÿ15·ÖÖÓ¼ì²éÄཬ±ÈÖØ Reverse out excess cement. ·´Ñ­»·Ìæ³ö¶àÓàµÄÄཬ

Change/replace old mud by new mud. ÓÃеÄÄà½¬Ìæ»»³ö¾ÉµÄÄཬ Stop drilling. Í£Ö¹×ê½ø Drilling ahead. ×ê½ø

Pull out of hole bit. Æð³ö×êÍ· Change bit. »»×êÍ·

Run the wear bushing. Ï¿¹Ä¥²¹ÐÄ

The bit thread type is regular pin. ×êÍ·Ë¿¿ÛÊÇÕý¹æ¹«¿Û What¡¯s the make-up torque? ÉÏ¿ÛŤ¾ØÒª¶à´ó? Run in 9¡± collars. ÏÂ9¡±×êîú

The cathead can¡¯t give enough torque. èͷÁ¦Á¿²»¹» Connect crossover sub. ½ÓÉÏÅäºÏ½ÓÍ·

The tong angle is too small. ´óǯµÄ½Ç¶È̫СÁË Stop circulating. ֹͣѭ»·Äཬ Break out the stand. жÁ¢Öù

Set the single into the mousehole. °ÑÕâ¸öµ¥¸ù·Å½øÊó¶´

Can we break out the pipe with rotary table? ¿ÉÓÃתÅÌж¿ÛÂð? No! Break it out with tong. ²»ÐÐ! ÒªÓôóǯж¿Û Spin it out with the air spanner. ÓÃÆø¶¯°âÊÖж¿Û Put the pipe wiper on the string. ×°ÉÏ×ê¸Ë¹ÎÄàÆ÷ Don¡¯t set this stand back. Õâ¸ù×ê¸Ë²»Òª·ÅÔÚ×ê¸ËºÐÉÏ Make up the lift sub. ½ÓºÃÌáÉý¶Ì½Ú Secure the safety clamp. ÉϽô°²È«¿¨Íß

The bit is nearing the shoe. ×êÍ·¿ìµ½Ì×¹ÜЬÁË Slow down the running speed. ·ÅÂýÏ·ÅËÙ¶È

This is the undergauged interval. ÕâÊÇËõ¾¶¾®¶Î This is the drilling program. ÕâÊÇ×ê¾®Éè¼ÆÊé

How much weight on bit is required? Òª¼Ó¶àÉÙ×êѹ?

Keep the rotary speed at 120---140 RPM. תËÙ±£³Ö120---140ת/·Ö Keep the flow rate at 3000 LPM. ±£³ÖÅÅÁ¿3000Éý/·Ö The pump pressure is too high. ±Ãѹ̫¸ßÁË Don¡¯t ream the hole too fast. »®ÑÛ²»ÒªÌ«¿ì Notice the rotary torque. ×¢ÒâתÅÌŤ¾ØµÄ±ä»¯

The penetration rate is getting slower. ×êËÙ±äÂýÁË The bit is nearly worn out. ×êÍ·¿ìÄ¥¹âÁË

Stop drilling at 2000 meters. ×êÖÁ2000Ã×Í£×ê Circulate for one hour. Ñ­»·Ò»¸öСʱ

The pump pressure has increased. ±ÃѹÉý¸ßÁË

One nozzle may be plugged. ¿ÉÄÜÓÐÒ»¸öË®ÑÛ(»ò: Åç×ì)¶ÂÁË What is the hook load? ÐüÖØ¶àÉÙ?

What¡¯s the pick-up weight? ÉÏÌáÖØÁ¿ÊǶàÉÙ? What¡¯s the lowering weight? Ï·ÅÖØÁ¿ÊǶàÉÙ? Run in HWDP. ϼÓÖØ×ê¸Ë

A stabilizer is needed here. ÕâÀïÐèÒªÒ»¸ö·öÕýÆ÷ This is a flexible sub. ÕâÊÇÄÓÐÔ½ÓÍ·

This is the BHA log. ÕâÊÇϲ¿×ê¾ß×éºÏ¼Ç¼

Record all outside and inside diameters. ¼Ç¼ºÃËùÓÐ(Èë¾®¹¤¾ßµÄ)ÄÚÍâ¾¶ We need a short drill collar. ÐèÒªÒ»¸ù¶Ì×êîú Pull the cat line. À­Ã¨Í·

Operate the break lever. ²Ù×÷(»ò:·ö)ɲ°Ñ

Stop the pumps. Í£±Ã Make a wiper trip. ͨ¾®

Retrieve wear bushing. È¡³ö¿¹Ä¥²¹ÐÄ Bleed off pressure. (ÊÍ)·Åѹ(Á¦)

Keep 5 wraps on the drum. ¹öͲÉÏÁô5Ȧ Set slips. ×ùÉÏ¿¨Íß

If tight hole, repeat wiper trip. Èç¹û¾®ÑÛ½ô, ÖØ¸´»®ÑÛ Setback bottom hole assembly. ½«Ï²¿×ê¾ßÁ¢ÓÚ×ê¸ËºÐÄÚ Make sure all alarms are on. È·±£ËùÓеľ¯±¨ÐźŶ¼¿ª×Å Lay down TDS spinner. ²ð϶¥²¿Çý¶¯µÄÐý¿ÛÆ÷

Run in hole bit #15 to bottom. ÓÃ15ºÅ×êÍ·ÏÂ×êµ½¾®µ× Run in hole to casing shoe. ÏÂ×êÖÁÌ×¹ÜЬ

Pick up same bit and BHA. ×°ÉÏͬÑùµÄ×êÍ·ºÍ×ê¾ß×éºÏ Lay down 5¡± HW drill pipe. ˦5¡±¼ÓÖØ×ê¸Ë

Move string every 2 hours. ÿ2Сʱ»î¶¯×ê¾ßÒ»´Î Keep area around shaker clean. ±£³ÖÕñ¶¯É¸ÇøÓò¸É¾» Control trip gas. ¿ØÖÆÆðÏÂ×êÆø Ream if needed. Èç±ØÒªÊ±½øÐл®ÑÛ

Select the best penetration rate. Ñ¡Ôñ×î¼Ñ×ê½øËÙ¶È Fix the traveling assembly. ¹Ì¶¨Óζ¯ÏµÍ³

100. Check power tongs and spinning rope are on drill floor. ¼ì²é¶¯Á¦Ç¯ºÍβÉþÊÇ·ñÔÚ×ę̂

What¡¯s the weight on bit? ×êѹÊǶàÉÙ?

What is the BHA of this well? Õâ¿Ú¾®µÄϲ¿×ê¾ßÈçºÎ×éºÏ? Drill out cement. ×ê´©Ë®Äà

Drill out 20¡± casing shoe. ×ê´©20¡±Ì×¹ÜЬ Latch the elevator. ¿Ûµõ¿¨ Unlatch the elevator. ¿ªµõ¿¨ Set the slips. ·Å¿¨Íß

Adjust the crown-o-matic (crown saver). µ÷Õû·ÀÅöÌì³µ Lock the hook pin. Ëø½ô´ó¹³Ïú×Ó

Check OD of stabilizer. ¼ì²é·öÕýÆ÷µÄÍâ¾¶

Perform leak off test. ½øÐÐµØ²ãÆÆÁÑ(»ò:ÉøÂ©)²âÊÔ Connect kill and choke line. ½ÓÉÏѹ¾®ºÍ·ÅÅç¹ÜÏß Reverse out the drill pipe. ·´Ñ­»·ÇåÏ´×ê¸Ë Make a short trip. ½øÐжÌ;ÆðÏÂ×ê Change the cutters. »»¸îµ¶ Slug the pipe. ¹àÖØÄཬ

Drill the stand down. ×êÍêÁ¢Öù

Start/run the shale shaker. ¿ªÕñ¶¯É¸ Start the desanders. ¿ª³ýɰÆ÷ Start the desilters. ¿ª³ýÄàÆ÷

Change it with a 40 mesh screen. »»³É40Ŀɸ²¼

Shut it off. ¹Øµô

Pull it to the cat ramp. °ÑËüÀ­µ½ÆÂµÀÉÏÈ¥ Make a fast connection. ½Óµ¥¸ùÒª¿ì

Don¡¯t dump the mud into the sea. ²»Òª°ÑÄཬÅŷŵ½º£Àï Disconnect it with a chain tong. ÓÃÁ´Ç¯Ð¶¿ª Put a thread protector. ¼ÓÒ»¸ö(Ë¿¿Û)»¤¹¿

Can we use the power slips? ¿ÉÒÔʹÓö¯Á¦¿¨ÍßÂð?

Casing and Cementing ÏÂÌ×¹ÜÓë¹Ì¾®

Run in hole to bottom for wiper trip. ÏÂ×êͨ¾® This is the casing program. ÕâÊÇÌ׹ܳÌÐò Prepare for running casing. ×¼±¸ÏÂÌ×¹Ü

Make everything ready for running 7¡±casing. ×öºÃÏÂ7¡±Ì׹ܵÄ×¼±¸ Make cementing job. ¹Ì¾®

Displace cementing with mud pump. ÓÃÄཬ±ÃÌæÄཬ

Set cement plug from 2940 to 2790m. ÔÚ2940µ½2790Ã×¾®¶Î´òË®ÄàÈû Pick up cementing head. ½ÓË®ÄàÍ·

Cement samples are hard. Ë®ÄàÑùÒÑÄý¹Ì

Pump in 3 cubic meters of spacer. ×¢3·½¸ôÀëÒº Pump down the plug. ±Ãѹ(½º)Èû Wait on cement. ºòÄý

The guide shoe will be connected. ½ÓÒýЬ Connect the floor collar. ½Ó¸¡¹¿

Connect the air line to the casing stabbing board. ½ÓºÃÌ×¹Ü ·öÕý̨µÄÆø¹ÜÏß Run casing with the 350T slip elevator. ÓÃ350¶Ö¿¨Íßʽµõ¿¨ÏÂÌ×¹Ü Clean and dry 20¡± casing threads with rags. Çå½à²¢²Á¸É20¡±Ì×¹ÜË¿¿Û Where is the rabbit for drifting the casing? Ì×¹Üͨ¾¶¹æÔÚÄÄÀï? Rig Move, Anchoring and Positioning ÍϺ½, Å×ê, ¶¨Î»

What is our position now? ÎÒÃÇÏÖÔÚ´¬Î»ÔÚÄÄÀï?

What¡¯s the moving speed now? (What¡¯s the towering speed?) ÍϺ½ËÙ¶ÈÊǶàÉÙ? The speed is about 4 knots. ´¬ËÙÊÇ4½Ú×óÓÒ Which one is the main tug? Ö÷ÍÏÊÇÄÄÌõ´¬? The main tug is Nanhai 205. Ö÷ÍÏÊÇÄϺ£205 Which one is the chase boat? »¤º½´¬ÊÇÄÄÒ»Ìõ? How much is the horse power? Óжà´óÂíÁ¦? She has 6000 HP. ÓÐ6000ÂíÁ¦

Move the rig off location 50 feet. ½«Æ½Ì¨ÒÆ¿ª50Ó¢³ß

We are ready to drop the anchor. ÎÒÃÇÒѾ­×öºÃÅ×êµÄ×¼±¸ÁË Secure all the movable equipment. ¹Ì¶¨ºÃ¸÷ÖֻµÄÉ豸 Preload. (×ÔÉýʽ)Ñ¹ÔØ Ballast. (°ëDZʽ)Ñ¹ÔØ

ËÑË÷¸ü¶à¹ØÓÚ£º º£ÑóʯÓÍ×ê¾®³£ÓÃÓ¢ÓïÊÖ²á µÄÎĵµ
º£ÑóʯÓÍ×ê¾®³£ÓÃÓ¢ÓïÊÖ²á.doc ½«±¾ÎĵÄWordÎĵµÏÂÔØµ½µçÄÔ£¬·½±ã¸´ÖÆ¡¢±à¼­¡¢ÊղغʹòÓ¡
±¾ÎÄÁ´½Ó£ºhttps://www.diyifanwen.net/c6bxqx3va371emx02t1ki_1.html£¨×ªÔØÇë×¢Ã÷ÎÄÕÂÀ´Ô´£©
ÈÈÃÅÍÆ¼ö
Copyright © 2012-2023 µÚÒ»·¶ÎÄÍø °æÈ¨ËùÓÐ ÃâÔðÉùÃ÷ | ÁªÏµÎÒÃÇ
ÉùÃ÷ :±¾ÍøÕ¾×ðÖØ²¢±£»¤ÖªÊ¶²úȨ£¬¸ù¾Ý¡¶ÐÅÏ¢ÍøÂç´«²¥È¨±£»¤ÌõÀý¡·£¬Èç¹ûÎÒÃÇ×ªÔØµÄ×÷Æ·ÇÖ·¸ÁËÄúµÄȨÀû,ÇëÔÚÒ»¸öÔÂÄÚ֪ͨÎÒÃÇ£¬ÎÒÃǻἰʱɾ³ý¡£
¿Í·þQQ£ºxxxxxx ÓÊÏ䣺xxxxxx@qq.com
ÓåICP±¸2023013149ºÅ
Top