Power generation of Wind Turbines since 20032003Äêºó·çµç×´¿ö
TheEuropean UCTE interconnected 400 kV systemÅ·ÖÞµçÁ¦´«Êäе÷ÁªÃËUCTE»¥ÁªµÄ400kV ϵͳ
RedºìÉ«: 500 kV TransmissionÊäµçÍøBrownרɫ: 330 kV¨¹bertragung
10
LVRT Workshop Beijing 06./07. January 2009Weck: LVRT requirements and testing
Power generation of Wind Turbines since 20032003Äêºó·çµç×´¿ö
TheEuropean UCTE interconnected 400 kV systemÅ·ÖÞµçÁ¦´«Êäе÷ÁªÃËUCTE»¥ÁªµÄ400kV ϵͳ
414
3
UCTE:
Co-operation of European transmission system operatorsUCTE:
Å·ÖÞµçÁ¦´«Êäе÷ÁªÃËTransmission systems (400 kV) directly connected
Êäµçϵͳ(400 kV) Ö±½ÓÏàÁ¬Permissible simultaneous disconnection of generation 3.000 MWto avoid Power flow oscilations
Ϊ±ÜÃâ³±Á÷Õñµ´£¬ÔÊÐíͬʱÇгý3000 MWµÄ·¢µçÈÝÁ¿
Connection to the remote ends of the UCTE system½ÓÈëUCTE ϵͳԶ¶Ë
8
8
Installed power in GW 20042004Äê×°»úÈÝÁ¿GW
11
LVRT Workshop Beijing 06./07. January 2009Weck: LVRT requirements and testing
Power generation of Wind Turbines since 20032003Äêºó·çµç×´¿ö
Scenario during faults in system of E.ON NetzE.ON NetzϵͳÄÚ¹ÊÕÏÇéÐÐScenarioÇéÐÐ: 2001Short-circuit at Dollern, E.ONE.ONµçÍøÄÚDollern´¦¶Ì·100kmVoltage reduction protection at 80% of system voltage:Disconnection of all WT at E.ONµçѹ±£»¤ÔÚµçѹ½µÖÁ¶î¶¨µçѹµÄ80%ʱ¶¯×÷£¬½«E.ONËùÓеķçµç»ú×éÇгýUCTE limit exceeded already in 2001³¬¹ýÁË2001ÄêUCTEÔÊÐíµÄ¼«ÏÞÖµQuelle: U. Radtke, FGH-Seminar ?Power Quality¡°12LVRT Workshop Beijing 06./07. January 2009Weck: LVRT requirements and testingGrid Codes since 20012001ÄêºóµÄ²¢Íøµ¼Ôò
Windturbines connection to the High-Voltage system½ÓÈë¸ßѹµçÍøµÄ·çµç»ú×é
??Specification of requirements ¹æ·¶
??2003: First specification by system operator E.ON
ϵͳÔËÓªÉÌE.ONÌá³öµÚÒ»¸ö¹æ·¶¨¤First Grid Code for wind farms worldwide¨¤È«ÊÀ½çµÚÒ»¸ö¹ØÓÚ·çµç³¡µÄ²¢Íøµ¼Ôò
??2004: Second specification by system operator Vattenfall Europe
µÚ¶þ¸ö¹æ·¶ÓÉϵͳÔËÓªÉÌÅ·ÖÞVattenfall¹«Ë¾Ìá³öSpecifications of the system operator organisation VDNϵͳÔËÓªÉÌ×éÖ¯VDNµÄ¹æ·¶??Reactive power in normal system operationϵͳÕý³£ÔËÐÐʱÎÞ¹¦¹¦ÂÊ
??Performance during system faults ϵͳ¹ÊÕÏÆÚ¼äÌØÐÔ
¨¤Continuous power generation during faults in the high-voltage system¨¤¸ßѹϵͳ¹ÊÕÏÆÚ¼äÈÔ³ÖÐø·¢µç
¨¤Increased reactive power generation during system faults depending on the degree of voltage reduction
¨¤¹ÊÕÏÆÚ¼ä¸ù¾Ýµçѹ½µµÍ³Ì¶ÈÔö¼ÓÎÞ¹¦¹¦ÂʳöÁ¦
¨¤Reduction of active power generation at system over-frequency¨¤µ±ÏµÍ³¸ßƵʱ½µµÍÓй¦¹¦ÂʳöÁ¦13
LVRT Workshop Beijing 06./07. January 2009Weck: LVRT requirements and testing
??Main requirementsÖ÷ÒªÒªÇó
German Grid Codes todayÏÖ½ñµÂ¹ú²¢Íøµ¼Ôò
??2007: Transmission Code Êäµçµ¼Ôò2007
??Specifications of the German Transmission System Operators (TSO)for the connection of power generation plants to the transmission system
??µÂ¹úÊäµçϵͳÔËÓªÉÌ(TSO) ¶Ô½ÓÈëÊäµçϵͳµÄ·¢µç³§µÄ¼¼Êõ¹æ·¶ÒªÇó
??2007: Distribution Code Åäµçµ¼Ôò2007
??Specifications of the German Distribution System Operators (DSO)for the connection of power generation plants to the distribution system
??µÂ¹úÅäµçϵͳÔËÐÐÉÌ(DSO) ¶Ô½ÓÈëÊäµçϵͳµÄ·¢µç³§µÄ¼¼Êõ¹æ·¶ÒªÇó
??2008: BDEW specifications for generating plants at the
distribution system
??2008: BDEW ¶ÔÅäµçÍøÄÚ·¢µç³§µÄ¼¼Êõ¹æ·¶ÒªÇó??Newly developed principlesÐÂÖÆ¶¨µÄ¹æÔò
??All types of generating plants are treated equallyËùÓÐÀàÐ͵ķ¢µç³§Í¬µÈ¶Ô´ý
¨¤Distinguished only by type½ö¸ù¾Ý·¢µç»úÀàÐͼÓÒÔÇø·Ö
-Type 1: Generation plants with synchronous generators-ÀàÐÍ1£ºÊ¹ÓÃͬ²½·¢µç»úµÄ·¢µç³§
-Type 2: Generation plants with other generator types-ÀàÐÍ2£ºÊ¹ÓÃÆäËûÀàÐÍ·¢µç»úµÄ·¢µç³§
14
LVRT Workshop Beijing 06./07. January 2009Weck: LVRT requirements and testing