雁栖湖示范区再生水管线水源连通工程
(主体工程)
旁站监理实施细则
编制人:
审批人:
北京正细工程监理有限公司
2020年3月31日
目录
1.总则 ....................................................................................................................................... 1 1.1编制目的 ......................................................................................................................... 1 1.2适用范围 ......................................................................................................................... 1 1.3编写依据 ......................................................................................................................... 1 2.旁站监理范围、程序和方法 ............................................................................................... 2 2.1旁站监理范围 ................................................................................................................. 2 2.2旁站监理程序 ................................................................................................................. 2 2.3旁站监理方法 ................................................................................................................. 2 3.旁站监理人员职责 ............................................................................................................... 3 4.旁站监理记录要求 ............................................................................................................... 4 5.旁站监理工作制度 ................................................................................................................ 4
1.总则
1.1编制目的
为加强本工程的旁站监理管理,提高本工程的旁站质量,规范监理质量控制,促进工程旁站监理工作的规范化、标准化、程序化,依据雁栖湖示范区再生水管线水源连通工程(主体工程)建设监理合同(以下简称“合同”),以及国家或建设部颁布的现行有关规程规范、技术标准和水电水利工程质量管理的有关规定等要求制定本方案。 1.2适用范围
本细则适用于雁栖湖示范区再生水管线水源连通工程(主体工程)。针对合同监理范围内需纳入工程旁站监理的全部部位、工序、作业、时段及重要隐蔽工程。对影响施工质量的关键部位、关键工序、特殊作业、关键施工时段及下道工序施工完成后难以检查的重点部位必须进行旁站监理。 1.3编写依据
(1)国家的法律和行政法规及地方性法规; (2)委托人与工程监理人签订的委托监理合同文件;
(3)合同中引用的国家和行业(或部颁)的现行施工操作技术规范、施工工艺规程及验收规范、评定规程;
(4)已批准的《雁栖湖示范区再生水管线水源连通工程(主体工程)监理规划》;
(5)已批准的施工组织设计、施工技术措施及施工方案。