摘要
南城李中桥工程概况:由三跨组成,全长43.08米,桥梁面积516.96m2。上部结构采用预应力空心板梁,长13m,空心板梁共27片;下部结构采用重力式桥台和柱式桥墩,基础采用钻孔灌注桩。
在全面了解工程概况,熟悉了设计图纸后,对施工管理机构、资源配置、施工总平面图进行了设计,在确保质量、工期、安全的前提下,制定切实可行的施工方案和施工进度计划编,取得了良好的效果。
通过这次设计对施工组织设计和预算的各方面都有了深刻的认识,达到了预期的目的。
关键词 预应力 钻孔灌注桩 重力式桥台 施工组织设计
I
Abstract
Based on the study of shop drawing of Sha-jian revier bridge,we comprehened Project survey that the bridge is composed by 3 spans,whose length is 43.08 meters and area is 516.96 square meter. The superstructure of this bridge introduces prestressed concrete T simple beam,whose number is 27 patches and length is 13 meters,the substructure is prestressed concrete coping and Bored piles as well as Gravity abutment.
We design overall construction site plan and project administrative agency along with resource collocation when we have compreheneded Project survey and had acquaintance with blueprint. On the premise of quality ,time limit for a project and safety, we also Formulate the practical feasible construction plan, establish drawing budget,which has obtained the good effect.
After this design we have understanded all the budget and construction managenment plan, achieved the anticipated goal, simultaneously also accumulated thecertain construction experience.
Keywords Prestress Bored piles Gravity abutment Construction Organizati
II
目录
摘要 ............................................................... I Abstract .......................................................... II 第1章 绪论 ....................................................... 1
1.1选题意义 ................................................... 1 1.2 工程背景 .................................................. 1
1.2.1工程概况 ............................................. 1 1.2.2工程场地自然条件 ..................................... 2 1.3编制说明 ................................................... 3
1.3.1编制依据 ............................................. 3 1.3.2编制原则 ............................................. 3
第2章 施工管理机构 ............................................... 7
2.1项目部组织机构 ............................................. 7 2.2项目部门的主要职责 ......................................... 8 2.3项目主要管理及技术人员职责 ................................ 11 2.4项目管理 .................................................. 15 第3章 资源配置计划 .............................................. 17
3.1劳动力需要量计划 .......................................... 17 3.2主要材料需要量计划 ........................................ 18 3.3主要机具设备需要量计划 .................................... 19 第4章 施工准备 .................................................. 20
4.1现场准备 .................................................. 20 4.2技术准备 .................................................. 21
4.2.1技术、规划准备 ...................................... 21 4.2.2熟悉、审查设计图纸及有关资料 ........................ 22 4.3劳动力准备 ................................................ 23 4.4物资准备 .................................................. 23 4.5设备准备 .................................................. 24 4.6生产准备 .................................................. 24
III
第5章 施工总平面图设计及临时设施规划 ............................ 25
5.1施工平面图设计 ............................................ 25 5.2临时设施规划 .............................................. 25 第6章 主要工程项目施工方案 ...................................... 27
6.1总体施工概述 .............................................. 27 6.2钻孔灌注桩施工 ............................................ 28
6.2.1钻孔灌注桩施工 ...................................... 28 6.2.2事故的预防 .......................................... 32 6.3承台施工 .................................................. 35 6.4墩台施工 .................................................. 37 6.5盖梁施工方案 .............................................. 38 6.6 板梁预制 ................................................. 41
6.6.1.预制场地布置及制梁台座设置 .......................... 41 6.6.2.制梁进度安排 ........................................ 42 6.6.3.工艺流程 ............................................ 42 6.6.4.制梁工艺 ............................................ 42 6.7 板梁架设 ................................................. 46
6.7.1.施工便道 ............................................ 46 7.7.2台冒的测设和检查 .................................... 47 6.7.3预制板梁出场前检查 .................................. 48 6.7.4空心板梁的运输和架设 ................................ 48 6.7.5资料填写 ............................................ 49 6.7.6安全要求 ............................................ 49 6.8桥面施工方案 .............................................. 50 6.9台背回填砂砾施工 .......................................... 53 6.10护坡、锥坡工程施工 ....................................... 54 第7章 施工目标及进度计划 ........................................ 55
7.1总体施工目标 .............................................. 55 7.2施工顺序 .................................................. 56 7.3施工总体进度计划 .......................................... 56 第8章 质量保证 .................................................. 58
8.1工程质量计划 .............................................. 58
IV
8.2质量管理 .................................................. 58 8.3质量保证措施 .............................................. 59
8.3.1质量保证体系 ........................................ 59 8.3.2测量工作的质量保证措施 .............................. 60 8.3.3实验工作的质量保证措施 .............................. 60 8.3.4材料质量保证措施 .................................... 60 8.3.5钢筋施工质量保证措施 ................................ 61 8.3.6支架及模板质量保证措施 .............................. 62 8.3.7混凝土的质量保证措施 ................................ 62 8.3.8桥梁施工的质量保证措施 .............................. 63 8.3.9工期紧时的质量保证措施 .............................. 65 8.3.10已完工程的保护措施 ................................. 65 8.3.11保修回访措施 ....................................... 65 8.4质量通病防治 .............................................. 66 8.5工程质量管理制度 .......................................... 66 8.6工程档案资料管理 .......................................... 67 第9 章 安全保证体系 ............................................ 70
9.1施工安全生产目标 .......................................... 70 9.2安全生产保证体系 .......................................... 70 9.3主要施工项目安全技术措施 .................................. 71 第10章 文明施工和现场环境保护 ................................... 74
10.1文明施工 ................................................. 74
10.1.1文明施工目标 ....................................... 74 10.1.2文明施工管理 ....................................... 74 10.1.3文明施工监督检查制度 ............................... 74 10.1.4文明施工具体措施 ................................... 75 10.2环境保护 ................................................. 77 第11章 季节性施工措施 ........................................... 79
11.1夏季施工措施 ............................................. 79 11.2雨季施工措施 ............................................. 79 11.3夜间施工措施 ............................................. 79 第12章 新技术的研究与推广 ....................................... 81
V
搜索“diyifanwen.net”或“第一范文网”即可找到本站免费阅读全部范文。收藏本站方便下次阅读,第一范文网,提供最新初中教育道桥施工组织设计 全文阅读和word下载服务。
相关推荐: