Design and Evaluation of Tailings Dams

Figure 2. Embankment Types: (a) Upstream, (b) Centerline, (c) Downstream or Water Retention

Type

(Source: Vick 1990)

Finally, the phased nature of raised embankments makes it possible to attempt to address problems that may

arise during the life of a tailings impoundment. For example, at the Rain facility in Nevada, unplanned

seepage under and through the base of the tailings embankment made design changes necessary. The fact

that this was a raised embankment made it possible to attempt engineered solutions to the problem as the dam

was enlarged and raised during later phases of construction, and this could be accomplished without taking

the impoundment out of service and without moving enormous quantities of fill material or impounded

tailings.

2.2.1Valley Impoundments

Other things being equal, it is economically advantageous to use natural depressions to contain tailings.

Among other advantages are reduced dam size, since the sides of the valley or other depression serve to

contain tailings. In addition, tailings in valleys or other natural depressions present less relief for air

dispersion of tailings material. As a result, valley impoundments (and variations) are the most commonly

used. Valley-type impoundments can be constructed singly, in which the tailings are contained behind a

搜索“diyifanwen.net”或“第一范文网”即可找到本站免费阅读全部范文。收藏本站方便下次阅读,第一范文网,提供最新人文社科技术报告-尾矿库设计及评估 (英文)(16)全文阅读和word下载服务。

技术报告-尾矿库设计及评估 (英文)(16).doc 将本文的Word文档下载到电脑,方便复制、编辑、收藏和打印
本文链接:https://www.diyifanwen.net/wenku/1194740.html(转载请注明文章来源)
热门推荐
Copyright © 2018-2022 第一范文网 版权所有 免责声明 | 联系我们
声明 :本网站尊重并保护知识产权,根据《信息网络传播权保护条例》,如果我们转载的作品侵犯了您的权利,请在一个月内通知我们,我们会及时删除。
客服QQ:xxxxxx 邮箱:xxxxxx@qq.com
渝ICP备2023013149号
Top