技术报告-尾矿库设计及评估 (英文)

Design and Evaluation of Tailings Dams

Figure 4. Single (a) and Multiple (b) Side-Hill Impoundments

(Source: Vick 1990)

Other types of valley impoundments may be employed when there is an excessively large drainage catchment

area and/or there is a lack of necessary valley topography. Two variations are the side-hill impoundment and

the valley-bottom impoundment. The side-hill layout consists of a three-sided dam constructed against a

hillside (Figure 4). This design is optimal for slopes of less than 10% grade. Construction on steeper slopes

requires much more fill volume to achieve sufficient storage volume (especially when using the downstream

method of construction).

If the drainage catchment area is too large for a cross-valley dam and the slope of the terrain is too steep for a

side-hill layout, then a combination of these two designs, the valley-bottom impoundment, may be considered

(Figure 5). Valley-bottom impoundments are often laid out in multiple form as the valley floor rises, in order

to achieve greater storage volume. Because the upstream catchment area is relatively large, it is often, or

搜索“diyifanwen.net”或“第一范文网”即可找到本站免费阅读全部范文。收藏本站方便下次阅读,第一范文网,提供最新人文社科技术报告-尾矿库设计及评估 (英文)(19)全文阅读和word下载服务。

技术报告-尾矿库设计及评估 (英文)(19).doc 将本文的Word文档下载到电脑,方便复制、编辑、收藏和打印
本文链接:https://www.diyifanwen.net/wenku/1194740.html(转载请注明文章来源)
热门推荐
Copyright © 2018-2022 第一范文网 版权所有 免责声明 | 联系我们
声明 :本网站尊重并保护知识产权,根据《信息网络传播权保护条例》,如果我们转载的作品侵犯了您的权利,请在一个月内通知我们,我们会及时删除。
客服QQ:xxxxxx 邮箱:xxxxxx@qq.com
渝ICP备2023013149号
Top