Design and Evaluation of Tailings Dams

single dam or embankment; or in multiple form, in which case a series of embankments contain the tailings in

connected "stair-step" impoundments.

There are several variations of valley-type impoundments. The Cross-Valley design is frequently used

because it can be applied to almost any topographical depression in either single or multiple form. Laid out

similarly to a conventional water-storage dam, the dam is constructed connecting two valley walls, confining

the tailings in the natural valley topography. This configuration requires the least fill material and

consequently is favored for economic reasons. The impoundment is best located near the head of the drainage

basin to minimize flood inflows. Side hill diversion ditches may be used to reduce normal runon if

topography allows, but large flood runoff may be handled by dam storage capacity, spillways, or separate

water-control dams located upstream of the impoundment. Figure 3 shows single and multiple cross-valley

impoundment configurations.

搜索“diyifanwen.net”或“第一范文网”即可找到本站免费阅读全部范文。收藏本站方便下次阅读,第一范文网,提供最新人文社科技术报告-尾矿库设计及评估 (英文)(17)全文阅读和word下载服务。

技术报告-尾矿库设计及评估 (英文)(17).doc 将本文的Word文档下载到电脑,方便复制、编辑、收藏和打印
本文链接:https://www.diyifanwen.net/wenku/1194740.html(转载请注明文章来源)
热门推荐
Copyright © 2018-2022 第一范文网 版权所有 免责声明 | 联系我们
声明 :本网站尊重并保护知识产权,根据《信息网络传播权保护条例》,如果我们转载的作品侵犯了您的权利,请在一个月内通知我们,我们会及时删除。
客服QQ:xxxxxx 邮箱:xxxxxx@qq.com
渝ICP备2023013149号
Top