第一范文网 - 专业文章范例文档资料分享平台

模具设计外文翻译--注塑成型(6)

来源:用户分享 时间:2021-06-02 本文由白茶与风 分享 下载这篇文档 手机版
说明:文章内容仅供预览,部分内容可能不全,需要完整文档或者需要复制内容,请下载word后使用。下载word有问题请添加微信号:xxxxxx或QQ:xxxxxx 处理(尽可能给您提供完整文档),感谢您的支持与谅解。

e next part of the rotational part, is responsible for this part of molten material by shear. In this part, threaded depth constantly decrease, compression cladding material. Last part is measurement profile, this part of the threaded depth shallow, improve the quality of the melt and color of the distribution. In the screw front are able to let screw as extruder and piston check valves. When injected screw retrograde injection, stop order to form will guide material flow to the device of the screw front line to become a molten material pool or injection. The injection, check device to prevent injection flow back to screw parts. When injected began to establish and cooling time end, mould open. Mould open must abide by the slow - fast - slow. Molds must slowly opened to release the injection produces in the process of vacuum to prevent parts stay in fixed modules. Because of mobile launch system in fixed mode, so try to avoid this kind of circumstance. Then quickly open mold, if not using machine hand, mould only need to open enough to remove the parts distance. End must slow down to compensate mould impulse. If you don't slow down machine speed cannot accurate positioning, impact may damage the machine. When the mould opened, putting forward

搜索“diyifanwen.net”或“第一范文网”即可找到本站免费阅读全部范文。收藏本站方便下次阅读,第一范文网,提供最新初中教育模具设计外文翻译--注塑成型(6)全文阅读和word下载服务。

模具设计外文翻译--注塑成型(6).doc 将本文的Word文档下载到电脑,方便复制、编辑、收藏和打印
本文链接:https://www.diyifanwen.net/wenku/1204622.html(转载请注明文章来源)
热门推荐
Copyright © 2018-2022 第一范文网 版权所有 免责声明 | 联系我们
声明 :本网站尊重并保护知识产权,根据《信息网络传播权保护条例》,如果我们转载的作品侵犯了您的权利,请在一个月内通知我们,我们会及时删除。
客服QQ:xxxxxx 邮箱:xxxxxx@qq.com
渝ICP备2023013149号
Top